I Lightning rod protection
II Mesh cage protection
III Early streamer emission protection

I Lightning rod protection
Protection level : II as defined in NF C 17-100
Description : 6m high lightning rods installed on the roof.
Protection radius Rp = 12 metres at level II protection.
On the roof: equipotential interconnection of the lightning rods.
On the walls: each lightning rod is connected to a down conductor fitted with a dedicated earth rod.

Installation schematic :


II Compare to mesh cage protection
III Compare to Early streamer emission protection

Estimated cost: €33,000 (exc. tax) (including installation)

Block plan:

II Mesh cage protection
Protection level : II as defined in NF C 17-100
Description : 50 cm capture points installed around the roof perimeter every 15 metres and on the lift cage.
10 metre roof mesh grid.
On the walls: down conductors every 15 metres, the bottoms of which are connected to a series of dedidated earth rods..


Installation schematic : Estimated cost: €36,000 (exc. tax)(including installation)

Block plan :
III Early streamer emission protection
Protection level : II as defined in NF C 17-102
Description : 5m high early streamer emission lightning conductor on the roof of the lift cage.
Protection radius Rp = 83.5 metres (Δt = 47μs minimum) at level II protection.
The lightning conductor is connected to two down conductors (see NF C 17-102 § 2.3.2), each fitted with a dedicated earth rod..

Installation schematic
Estimated cost: €7,000 (exc. tax) (including installation)

Block plan :